Table of contents
September 15, 1860, Volume 3 No 12 (New Series) pp177-192
About the coverBooks
Top of page
Top of pageArticles
What was Learned by the Observations on the Late Eclipse - p177
doi:10.1038/scientificamerican09151860-177a
Boiler Explosion Caused by Sulphur Water - p178
doi:10.1038/scientificamerican09151860-178b
Iron Works-Their Location, Arrangement and Construction - pp180 - 181
doi:10.1038/scientificamerican09151860-180
Improved Plan for Graduating Thermometers - p182
doi:10.1038/scientificamerican09151860-182a
Telegraph Between the Atlantic and Pacific States - p183
doi:10.1038/scientificamerican09151860-183a
McCulloch's Grain-Drying and Evaporating Apparatus - p184
doi:10.1038/scientificamerican09151860-184a
Niagara Railroad Suspension Bridge - pp185 - 186
doi:10.1038/scientificamerican09151860-185b
Application for the Extension of a Patent - p186
doi:10.1038/scientificamerican09151860-186c
Elmer's Combined Watch Key and Guard Bar - p192
doi:10.1038/scientificamerican09151860-192